基于500kV紧凑型铁塔组立的关键技术与工艺优化研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:TM752 文献标志码:A文章编号:1001-5922(2026)03-0744-03

Research on key technologies and process optimization for the erection of 500kV compact transmission towers

HUANG Jianbo1,HUANG Xue²,HE Juan³

(1.State Grid Sichuan Electric Power company,Chengdu 61OO41,Chian; 2.State Grid Yibin Power Supply Company,Yibin 6440OO,Sichuan China; 3.Beijing Guodiantong Network Technology Co.,Ltd.,Beijing 1OoO71,Chian)

Abstract:To solve the problems related to the contradiction between transmission corridor compression and natural power improvement,aiming atthe characteristicsof smallphase-to-phase insulation distanceand complex tower window structure of compact transmision towers,a sectional pre-tightening and dynamic adjustment erection process for 500kV compact transmission towers was proposed. Through the optimization of suspension derrick external stay wires and boltanti-loosening measures,the risks of tower material deformationand phase-to-phase flashover in the traditional process were resolved.The research results show that this procsscan reduce construction errors and improve te safety of live-line operation,providing technical support for the compact construction of double-circuit transmission lines on the same tower.

Key words : 500kV ; compact type; transmission tower erection ; process

500kV 紧凑型输电技术通过优化导线布置与分裂根数,显著缩小线路走廊并提升自然功率,有效地解决土地资源紧张与输电容量矛盾[1-2]。(剩余4567字)