Compound preparation of a new grouting water plugging material and construction technology optimization for tunnels in water-rich strata

KANG Xubo (Shaanxi Huashan Road & Bridge Group Co.,Ltd.,Xi’an 71OooO,China)

Abstract:Water inrush and mud gushing in tunnels in water-rich strata directly threaten engineering safety,and grouting for water plugging is the core prevention and control measure.Basedon the No.1 and No.2 tunnels of a certain expressway,aiming at the complex conditions of developed karstand abundant groundwater,this studyresearched new grouting materials,optimized grouting processes,and constructed acomprehensive water plugging strategy.An adaptive inorganic water-fixing and composite grouting material was developed,the advanced curtain grouting and other processes were optimized,and a closed-loop system of geological survey,parameter adjustment and emergency response was established.Engineering verification shows that this technology effctively controls the water inflow of the tunnel,ensures the progress of construction,and provides a reference for similar projects.

Key words :water-rich stratum;tunnel construction; grouting water sealing

富水地层隧道施工常面临涌水突泥、围岩失稳难题,传统注浆技术存在材料适配差、工艺针对性弱、参数调整滞后等局限。(剩余6115字)