核能原型堆全生命周期价值挖掘研究

打开文本图片集
DOI:10.19981/j.CN23-1581/G3.2026.12.027
中图分类号:TL41
文献标志码:A
文章编号:2095-2945(2026)12-0107-05
Abstract: This paper traces the development status of nuclear power prototype reactors at home and abroad, analyzes the challenges faced by the prototype reactor after its completion, studies the value mining strategy of the prototype reactor, and proposes a systematic value realization path from multiple dimensions. Finally, the future development of nuclear power prototype reactors is prospected and the importance of continuous investment in maximizing the value of prototype reactors is emphasized.
Keywords: prototype reactor; value mining; advanced nuclear energy; test and verification; realization path
核能原型堆作为连接先进核能技术理论与武器装备、市场化应用的关键桥梁,其成功开发和高效利用对于推动先进核能技术发展,保障国防安全、能源安全,实现“双碳”目标具有至关重要的意义。(剩余5966字)