广阳湾站超大断面暗挖车站施工稳定性数值模拟研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号: U231+.3 文献标志码:A 文章编号:2095-2945(2025)30-0059-05

Abstract:Theconstructionof super-large-sectionundergroundexcavationstationsfaceschallengessuchaspoorstabilityof surroundingrock,dicultyinpredictionofdeformationdifcultyinconstruction,geaterimpactonthesurroudingenviroent, andhighconstructionsafetyrisks.Takingtheultra-large-sectionconcealedexcavationstationofGuangyangwanStationasthe engineeringbackground,Midas/GTSXisusedtoestablishanumericalcalculationmodelfortheonstructionofdoublesidewal headingfortheultra-large-sectionconcealedexcavationstationofGuangyangwanStationtostudythestressfield,displacement fieldandsufacesettlementtrendofthesuroundingrockatkeypointsofthestationstructureduringconstruction.Theresults showthatthedisplacemntofsurroundingrockissignificantlyafectedbystationexcavationandtempoarysupportremovalnd theexcavationofultra-largecross-sectionwillincreasethedisplacementrangeandvalue.Theverticaldisplacementchanges significantlybeforeandaftercoresoilexcavation,andthehorizontaldisplacementismostprominentatthefootofthewall.The designofthesupportingstructureplaysakeyroleinthedisplacementchange.Theresearchresultscanprovidereference materials for ultra-large-section underground excavation station projects.

Keywords:super-large-sectionundergroundexcavationstation;surroundingrockstability;numericalsimulation;subway; displacement change

21世纪以来,随着社会的迅猛发展,地铁施工技术得到极大提升,暗挖法因其占地面积小、对周边环境影响小的优点被广泛应用,目前常用的地铁车站暗挖方法包括洞桩法(PBA法)、双侧壁导坑法、拱盖法、中隔壁法(CD法)和交叉中隔壁法(CRD法)等[-3]。(剩余5065字)

目录
monitor
客服机器人