污水泵站除臭升级改造项目分析

打开文本图片集
关键词:污水泵站;除臭设施;升级改造;组合工艺;恶臭污染物 中图分类号:X703 文献标识码:A 文章编号:1008-9500(2026)03-0277-04 DOI:10.3969/j.issn.1008-9500.2026.03.085
Analysis of the Upgrading and Renovation Project for Deodorization of Sewage Pumping Stations
WANG Chao
(Shanghai Jiading DistrictWaterAffairs Management Center,Shanghai2O18Oo,China)
Abstract:AsewagepumpingstationinJiadingdistrict,Shanghaicityislocatedneartheresidentialarea,andteoiginal deodorizationfacilitiesaredesignedaccording totheEmisionStandardsforOdorPolutants (GB14554—1993),butthey cannolongermetthegrowingdemandfordeodorizationandurgentlyneed tobeupgradedandrenovated.Thisrenovation adopts a four stage combination process of “acid washing + Ultraviolet (UV) photolysis + alkali washing + dry chemical adsorption”,with a processing air volume of 5000m3/h .The monitoring results show that the emission quality concentration of the mainodorpollutants meets thelimitrequirementsoftheEmissonStandardsforOdorPollutants (DB31/1025—2016), which canprovidereferencefor theupgrading andrenovationofdeodorizationfacilities insimilarsewagepumping stations.
Keywords:sewage pumping station;deodorization facilities;upgrading andrenovation;combination process;odorous pollutants
随着城市化进程的加速,污水处理设施已成为城市基础设施建设的重要组成部分。(剩余5901字)